Home Remodeling Expert

NOW FOR $139,770.00 + TAX
TURNKEY
Financing is available
*Restrictions may apply. Up to 500 SQFT
Go to content
Blueprint INCLUDED
Finish Materials INCLUDED
Kitchen appliances INCLUDED
ADU
Accessory Dwelling Units (ADUs), also known as granny flats, in-law units, backyard cottages, or secondary units, are a versatile housing solution in California. These independent residential units share the same lot as a primary home. ADUs are an innovative, affordable, and effective way to add much-needed housing in the state.


HOME REMODELING EXPERT.
Convert Your Garage into Revenue
Our innovative, cost-saving building process allows us to install a backyard home — including appliances — at a guaranteed fixed price with zero hidden fees.

Blueprint Services (By ESL Designs INC)
What's NOT Included
1. City Permits
2. Any city fees
What's Included
Single story, studio, garage conversion ADU up to 500 Sqft

1.       Site plans.
2.       Floor plans ("As Built" and Propose).
3.       Electrical plans.
4.       Structural Engineering.
5.       Engineering calculations.
6.       Title 24 compliance.
Finish Materials (By US HOME CENTER)
What's Included (Company Selection ONLY)
1. Vinyl  floor
2. MDF  baseboard
3. One Zone mini split HVAC (Up to 1 Ton)
4. Kitchen prefab shaker cabinets
5. Kitchen  door handles
6. Kitchen  prefab countertop 2x9
7. Kitchen  sink stainless steel 50/50
8. Kitchen  faucets
9. Soaking  tub 60”
10. 24”  Vanity (Mix and Match)     
11. Vanity  faucet
12. Vanity  handles
13. Vanity  sink
14. Bath  mirror
15. Toilet.
16. Bathroom  tile 24x12
17. Garbage Disposal.
18. Vinyl windows
19. Kitchen Appliances - Refrigerator, Electric Range, MicroHood (Refrigerator, Electric Range, Microhood-Good For MAY 2026 only).
What's NOT Included
1. Interior/ Exterior doorknobs
2. Bathroom toilet paper holder/ towel bars.
ADU Structure (Studio Version Only)
What's NOT Included
1. Landscaping
2. New Gas meter
3. Demolition
What's Included
Single story, studio, garage conversion ADU up to 500Sqft
1. Foundation Excavation
2. Foundation
3. Framing
4. Rough Electrical (sub Panel up to 100Amp)
5.  Rough Plumbing (not including new sewer line or main waterline)
6. Windows installation
7.  Stucco
8. Insulation
9.  Drywall
10. Paint
11. Finish Electrical
12. Finish Plumbing
13. Final inspection
Back to content